Subscribe Free
in Air Transport

Strata expansion underway for Dreamliner vertical fin assembly

Posted 11 July 2019 · Add Comment

Work is now underway at the advanced composite aero structures manufacturing company, Strata, is to expand its current manufacturing facilities in Abu Dhabi to take on board the assembly of the Boeing 787 Dreamliner vertical fins.


The modifications to Strata’s existing facility at Nibras Al Ain Aerospace Park follow an agreement signed by the two aircraft manufacturers at Farnborough Airshow 2016. Under the agreement, Strata will replicate the capabilities of the Boeing Salt Lake City 787 vertical fin assembly line to sub-assemble vertical fins for the Dreamliner family of airplanes from its Al Ain facility.
“As a home-grown manufacturing company and an active player in the global aerospace industry, Strata’s continued evolution is built on our enduring commitment to provide competitive offering and high quality components for our international partners. Strata plus is an important milestone for the company to position it for the next phase of growth, as the technology-based expansion will be dedicated for the assembly of the B787 vertical fin assembly line,” said Ismail Ali Abdulla, CEO of Strata.
“Our relationship with Boeing on the 787 project further solidifies Strata’s position as a direct supplier of primary aero structure components to Boeing Commercial Airplanes programmes.”
Assembly is scheduled to start next year. The assembled part will be shipped to North Charleston, South Carolina, and installed on 787 fuselages.
“The expansion of their facilities is a significant commitment and investment by U.A.E. and Strata to advance their aerospace manufacturing capabilities and support their long-term economic vision,” said Bernard Dunn, president, Boeing Middle East, North Africa and Turkey. “For eight years, Boeing and Strata have worked closely to expand the global supply of aerospace composites and meet Boeing requirements for quality and affordability.”
As part of Strata’s preparations, the company is sending key UAE-based engineers leading the Al Ain manufacturing process to the USA for robust training programme at Boeing.
The training, which will ensure efficiency in the vertical fin production line, will empower Strata engineers with a deep understanding of technical responsibilities in adherence with the strict requirements of the product. A key part of the training will centre on the entire production system, including electrical system testing, and hydraulic and avionics systems.

* required field

Post a comment

Other Stories
Advertisement
Latest News

Turkey hot to trot

Turkey came out fighting at this year’s biennial International Defence Industry Fair (IDEF), held in Istanbul from April 30 to May 3. Alan Warnes was there.

Qatar Airways announces direct flights to Osaka

Qatar Airways announced today that direct flight services to Osaka, Japan will commence 6th April 2020.

Pegasus Airlines receives first A321neo of 100 A320 family aircraft order

Pegasus Airlines has taken delivery of its first A321neo aircraft as part of its 100 Airbus aircraft order signed in 2012, which was the single largest-ever aircraft order in Turkish civil aviation history at the time.

Turkish Aerospace to participate in Turkey’s largest aerospace and technology festival

Turkish Aerospace will participate in the second edition of Turkey’s largest aerospace and technology festival which will be held at Istanbul Ataturk Airport between September 17-22, 2019.

Joramco signs new maintenance agreement with ICBC Aviation Leasing

Joramco and ICBC Aviation Leasing, a company based in China have signed a heavy maintenance agreement to perform a redelivery check including a full paint livery for one A330 aircraft of its fleet.

Ethiopian launches ‘Feel Addis’ app

Passengers flying Ethiopian with layover between 8 and 24 hours in Addis Ababa are set to have their end-to-end layover experience transformed in a whole new way with the launch of the airline’s digitised transit package dubbed Feel

BIDEC SK0108301019
See us at
MEBAAMORBT2006260919AVAFA20BT2607050320Dubai AS BT2006211119MEBCONBT1607240919BIDEC BT0108301019AVMENA20 BT1309100620DIAC19_BT0509161119