Subscribe Free
in Airports

Lights on at Istanbul New Airport’s first runway

Posted 28 February 2018 · Add Comment

Construction of the first runway at Istanbul New Airport is finalised and the lights have been turned on at the runway number one.

The first runway, 3,750 m in length and 60 m in width, is poised for landing and takeoff.

Eighty percent of the initial phase is completed at Istanbul New Airport. The project is in the public eye worldwide prior to its opening scheduled for 29 October 2018. Of the three independent parallel runways designed as part of the first phase, the runway no. 1 of 3,750 m length and 60 m width has been finalized and lit for the first time. The runway, now primed for flights, features 34,183 LED fixtures. The lighting system was designed to meet the international standards and installed for a safe takeoff and landing.

Yusuf Akçayoğlu, CEO of IGA Airports Construction said: "We are working day and night for this project, which will put Turkey’s stamp on the history of aviation. The completion of the first phase draws nearer with every square meter built. We have recently finished the baggage system, which constitutes our airport’s core. And now we have made the runway number one ready for landing with all the required equipment and in compliance with the relevant global standards. We are looking forward to deliver Istanbul Airport in its entirety on 29 October 2018.” 

Istanbul New Airport is set to serve approximately 100 airlines and become the new aviation hub with 350 destinations in passenger and cargo transportation worldwide. The initial phase with a passenger capacity of 90 million will be commissioned with three independent parallel runways, taxiways, a terminal building, an air traffic control tower, communication and weather systems as well as other utility buildings.

Copyright: IGA / Istanbul New Airport.

 

* required field

Post a comment

Other Stories
Advertisement
Latest News

Airlines expectations rise for aircraft interiors

When Aircraft Interiors Middle East (AIME) takes place at Dubai World Trade Centre 25-26 February 2019, the region’s leading airlines will be using the event to research available technologies for their growing fleets.

Abu Dhabi Airports signs MoU with Daxing International Airport

Abu Dhabi Airports has signed a Memorandum of Understanding (MoU) with Beijing Daxing International Airport at the BDIA Management Centre in China last week, according to state news agency WAM.

Joramco and Kenya Airways sign maintenance agreement

Joramco and Kenya Airways, the flag carrier airline of Kenya, have signed a heavy maintenance agreement for the first time to perform OOP check for six B787 from the carrier’s fleet in addition to major modification tasks related to

Dubai Airports recognised for innovation and continued commitment to passenger experience

Dubai Airports has been honoured with awards for Tech Innovation of the Year and Airport of the Year at the 2019 Aviation Business Awards.

Turkish Airlines’ load factor 82.9% in September

Turkish Airlines recorded a 82.9% load factor in September.

Qatar Airways wins ‘Best Airline’ Award at U.K. Business Traveller Awards

Qatar Airways has been named ‘Best Airline’ at the prestigious 2019 Business Traveller Awards, held on Monday 7 October at London’s Royal Garden Hotel in front of 250 industry leaders.

TAA SK0907311219
See us at
Global Aircraft Maintenance BT0910061119AVAFA20BT2607050320Dubai AS BT2006211119BIDEC BT0108301019DIAC19_BT0509161119AVMENA20 BT1309100620