Subscribe Free
in General Aviation

BelugaXL is readied for electrical power-up

Posted 10 October 2017 · Add Comment

BelugaXL is readied for electrical power-up as integration of the no. 1 giant airlifter continues.

This new-generation specialised transport aircraft will make its maiden flight next summer

The first of five Airbus BelugaXL super transporters is well advanced in the build-up process. The project is on schedule for power-on process start at the end of this year.

During activity at Toulouse-Blagnac in southwestern France – home to Airbus’ primary industrial facility – three-quarters of the no. 1 BelugaXL’s structural assembly has been performed for the outsized aircraft.

Eric Belloc, who heads the BelugaXL final assembly activity, said all elements for the aircraft’s specially-designed tail section have now been received. These are due to be integrated on the no. 1 airframe once systems, mechanical and electrical integration – which currently is underway – is completed.

The next major step will be assembly of the front main deck cargo door, which is scheduled for the beginning of December.

The first BelugaXL’s first take-off is scheduled for next summer, ahead of a 10-month flight test certification campaign. The second aircraft will start final assembly process in December, and the remaining three airlifters will be produced at a rate of one per year.

“While challenging, this really is a great project,” Belloc noted. “The Beluga is a very special aircraft – a symbol of Airbus – and we’re proud to be working on the next-generation version.”

The BelugaXL was launched in November 2014 to address the transport and ramp-up capacity requirements for Airbus beyond 2019. Derived from the freighter version of Airbus’ A330-200 jetliner, the BelugaXL is six metres longer, one metre wider and has a payload lifting capacity six tonnes greater than the current Beluga A300-600ST.

 

When operational, the fleet of five BelugaXLs will take over transporting complete sections of Airbus aircraft among the company’s production sites around Europe and to final assembly lines in France, Germany and Spain. BelugaXL is due to enter service in 2019.

 

* required field

Post a comment

Other Stories
Advertisement
Latest News

Dubai Airshow will see its largest number of exhibitors

"When the Dubai Airshow opens its doors in under a month at DWC, Dubai Airshow site, visitors can expect to see a larger number of exhibitors and exciting new features in addition to the appearance of industry heavyweights and niche

UAE Space Agency welcomes Kuwaiti delegation

The UAE Space Agency has welcomed an official delegation from the Kuwaiti scientific, research and academic institutions visiting the UAE this week to learn about the experience, achievements and future plans of the UAE space sector.

Bahrain International Defence Exhibition and Conference takes place

The first edition of Bahrain International Defence Exhibition and Conference covering air, land and sea is taking place on October 16-18 at Bahrain International Exhibition & Convention Centre.

Gama takes full control of Middle East business

Gama Aviation has bought out its partners in the Gama MENA business based in Sharjah.

Dubai Airports wins at Aviation Business Awards

Dubai Airports, Dubai International (DXB), and Dubai World Central (DWC), were honoured with two awards at the 11th Aviation Business Awards on Wednesday.

Egis will support operational readiness of Saudia and Flyadeal in the new Jeddah Airport terminal

Egis was attributed a contract to provide assistance to Saudia airline and its subsidiary Flyadeal in transitioning to their new facilities at King Abdulaziz International Airport (KAIA) in Jeddah.

Aviation Africa SK18418
See us at
DASAS BT3006161117AIME BT1204240118Aviation Africa BT18418Global Aerospace BT28218DAS BT1105161117Aviation Show 267291117DIAC BT1105121117AIMA Africa 2017